Client: Harvest Natural Resources Inc. and Tately NV
Site: Budong Budong Block
Project Duration: 2009 and 2010-2013
Project Summary:
- Regional structural synthesis and basin analysis – Makassar Strait
- Assessment and interpretation of the onshore Tertiary Basins in West Sulawesi
- Construction and interpretation of regional structural sections and maps
- Interpretation of onshore 2D and 3D seismic survey and correlation with offshore seismic
Info Link
http://www.harvestnr.com/operations/indonesia.htmla>
http://investor.shareholder.com/harvestnr/secfiling.cfm?filingID=950123-11-77220>